AirLine Operator British Airways
787 Type 787-9
Delivery Date 01-07-2016
1st July,2016..British Airways is receiving its 10th 787-9 Dreamliner and its on the way to its new home London. This air frame actually delivered on 30th June ,while taxing for delivery flight it sufferred nose gear steering failure.
787 Type 787-9
Delivery Date 01-07-2016
1st July,2016..British Airways is receiving its 10th 787-9 Dreamliner and its on the way to its new home London. This air frame actually delivered on 30th June ,while taxing for delivery flight it sufferred nose gear steering failure.
No comments:
Post a Comment